The Cost of Manual Cleanup Adds Up
Real-world cost and savings example based on an existing production installation.
Without The Automatic Spillage Recovery System
WithThe Automatic Spillage Recovery System
* 3 workers dedicated exclusively to sweeping.
* Automated cleanup can reduce the need for repeated cleaning shutdowns during production.
* End-of-shift cleanup often requires 30+ minutes with the full production crew.
* Workers may need to clean in difficult-to-access areas near operating equipment.
*Dedicated sweeping labor can be significantly reduced or reassigned.
* Automated cleanup throughout production.
* End-of-shift cleaning can be reduced to 10 minutes or less. In the existing reference installation, end-of-shift cleanup was reduced to approximately 10 minutes or less.
* Reduces the need for repeated cleanup shutdowns during production.
* Cleaner and safer areas.
* A system that keeps saving after payback.
* Minimal maintenance.
CA$720
Example Daily Manual Cleanup Labor Cost
CA$15,600
Example Monthly Manual Cleanup Labor Cost
CA$187,200
Example Annual Manual Cleanup Labor Cost
12-18 Months
Project-Specific
Example calculation: 3 workers × CA$30/hour × 8 hours/day × 260 operating days/year = CA$187,200/year.
Example Return on Investment
Example Sweeper Module Cost
CA$199,000
10 modules × CA$19,900
CA$187,200
Based on the reference example
Annual Manual Cleanup Labor Cost
Reference Application Payback
12-18 Months
Year After Year
Ongoing Savings Potential
Most systems are quoted as complete custom projects. Sweeper modules start at CA$19,900 for a 20 ft × 8 ft configuration. Controls, PLC, VFDs, HMI, programming, installation requirements and system integration are quoted separately.
Final project pricing depends on facility layout, number of modules and application requirements.
Annual Labor Savings
What Will Manual Cleanup Cost Over 10 years?
CA $1.87M
10 years
Example Manual Cleanup Labor Cost
Automatic Recovery System
Custom Project Investment
Based on the example above, assuming constant labor cost and no wage inflation.
In the reference application shown above, the projected payback was approximately 12–18 months. After payback, the system can continue reducing recurring manual cleanup costs year after year.